The contractor first started digging in the wet spot on Grove #6 to locate any existing drain lines. A six inch diameter drain line was found, but wasn't flowing water. |
After removing a section of the 6" line we realized it was clogged with mud and debris. Cleaning it out wasn't possible so our only option was to replace it. |
Here's the trench that starts at the pond and extends up to the edge of the fairway. The pieces of pipe you see laying next to the trench are the old 6" pipe that was clogged. |
Near the edge of the fairway we discovered a 4" pipe laying on top of the 6" pipe. The 4" pipe comes from further up the fairway and had a constant flow of water. |
Once the trench was excavated and the old pipe was removed, the contractor installed new 6" drainage pipe and fresh gravel to keep the area dry. |
Another pipe was found during excavation which connected to the original 6" pipe closer to the pond. The contactor replaced the damaged section of pipe and connected it to the new 6" pipe. |